Upcoming Projects Dev

Global Beverage & Logistics Centre Inc.

Construction

  • Construction of one of the most technically advanced plants in North America located at 6070 Kestrel Road, Mississauga, Ontario.
  • Over 90,000+ sq ft manufacturing space operating 6 days a week with over 15,000 pallet position of storage in an fully automated refrigerated warehouse. production is robotically palletized from start to finish with a capacity of producing over 38,000 million cases of products per year.

Phases

  • Phase 1: By July 2024, the Plant will be operational with the ability to produce 450+ bpm (bottles per minute) of 1.5 litre PET (plastic). This line has potential of producing over 23 million+ cases per year.
  • Phase 2: By October 2024, Line 2 will be operational with the ability to produce 250+ bpm of 2.63 litre PET for Canada and the US markets. This line has the potential of producing over 15 million+ cases per year
  • Phase 3: By April 2025, Line 3 will be operational with the ability to produce 200+ bpm of 1.5 litre PET for Canada.

 

Our Certifications

  • Minute Maid Annual Letter
  • Coca-Cola GAO
  • FSSC 22000 + Costco
  • ISO: 9001, 14001, 45001
  • Non-GMO Certificate
  • CFIA: GPFHCL & SFCR
  • Triangle K Kosher Inspection (Simply CA Products)
  • OU Kosher Inspection (Simply US Products)
  • COR Kosher Inspections
  • Canadian Nuclear Safety Commission
  • Organic Certificate, Non-GMO Certificate